The above
project was authorized by Transport Bureau of Jiangsu Province in
1997. The project was accomplished In October of 1999, and the
research results were highly appraised by the national famous exert
commission in geotechnical engineering.
This
project was mainly focused on the practical methods to judge the
soil earthquake response and liquefaction, the techniques of dynamic
compaction and dry-vibrated gravel pile to improve the liquefied
ground, and the anti-earthquake principle for the bridge foundation
etc. Moreover, a new method called SASW was introduced to evaluate
the improvement effectiveness of the liquefied ground. The
relationship of the shear wave velocity measured from SASW and the
SPT number was also established for judgment of the liquefaction.
The technical process to control the treatment quality of liquefied
subgrade under a high-grade highway was also suggested.
The
research results of the project were awarded with the second-class
prize of Science and Te chnology
Progress. The direct economic effect produced by this project was 70
million RMB. The results obtained in this project have been applied
in the practical construction of other expressways in Jiangsu
Province.
|